BIM Coordination in EPC Projects: Eliminating Clashes Before Construction

How Revit, Tekla and Plant 3D models work together to catch clashes before they reach the site.

BIM Coordination in EPC Projects: Eliminating Clashes Before Construction

In EPC projects, construction conflicts are expensive. BIM coordination moves those conflicts from the field into the model — where they cost a mouse click instead of a crane day.

1. One Coordinated Model, Many Disciplines

Structural (Tekla), architectural (Revit), piping (Plant 3D / CADWorx) and electrical models are federated into a single coordination environment. Clash detection identifies interferences between steel, pipe, cable trays, HVAC and structure.

2. The 30/60/90 Workflow

Coordination happens in stages — 30%, 60% and 90% model reviews — so conflicts are resolved progressively, with an approved, frozen model before fabrication drawings are issued.

3. Fabrication-Ready Output

The payoff is fabrication documentation that is actually buildable: shop drawings, spool drawings, isometrics and MTOs extracted from the coordinated model, with fewer RFIs and change orders.

4. As-Built Accuracy

Updated models become accurate as-built records — valuable for plant operators for the entire life of the facility.